Calderas de Biomasa (Teruel - Spain)
2 turn-key biomass heating system installations.
1MW of installed power
Place: Pig Farms in Teruel (Spain)
Muti-fuel boiler, automatic feeding, inertia tank of 6.000 liters (1.585 galons), electrical installation, control system, separate boiler's building with a 75 m3 (2.649 cubic feet) silo, by-pass with break valve to function in a parallel for both biomass and gas oil systems.
Start of operations: November 2008

